Façades of Proposal 8
Front façade, facing West / Nishi. On the right a second bay window on the second floor is new.
The side façade facing South / Minami shows this bay window of the study.
Plans of Proposal 8
Structural Concept
Structure: load bearing walls
Pre crack joints
Piping
Second Floor
Waste water is collected in the two pipes in the staircase. Rainwater pipes are inside the façade.
First Floor
Exhaust of the fireplace through the facade. Piping of the airconditioning split unit runs through the wall down to the exterior units under the terrace (see basement drawing).
Basement
Waste water and rainwater from the basement has to be pumped up to sewerage level.
Staircase
Scheme 1 shows a recommended staircase with 230 mm per step.
Scheme 2 showes the minimum depth of steps: 220 mm per step.
The present design offers space for the staircase of 2m x 1.25m. Steps are measured on the climbing line. This is the line where the center of the body of the person moves when climbing the stairs. The climbing line is 300 mm from the walls.
In order to optimize depth of steps space has to be found by either moving the right hand wall or reducing thickness of the façade. Detailed design of the house has to reveal which option is best.
Scheme 2 showes the minimum depth of steps: 220 mm per step.
The present design offers space for the staircase of 2m x 1.25m. Steps are measured on the climbing line. This is the line where the center of the body of the person moves when climbing the stairs. The climbing line is 300 mm from the walls.
In order to optimize depth of steps space has to be found by either moving the right hand wall or reducing thickness of the façade. Detailed design of the house has to reveal which option is best.